Landscape Master Plan in Denver: Phasing a Big Yard

November 20, 2026

A landscape master plan is one drawing of your whole property, built in stages over several years instead of all at once. Ivy Street Design has been designing Denver metro landscapes since 1992, and the plan is what keeps phase three from undoing phase one.

Quick Summary

  • A landscape master plan in Denver maps the entire property first, then splits construction into phases that fit your budget and schedule.
  • Design the whole yard before building any of it. Phasing the build is fine. Phasing the thinking is where projects go wrong.
  • Build the most disruptive work first: drainage, grading, retaining walls, and the utilities that later phases will need.
  • Work outward from the house, so the space you use most is finished first.
  • Expect the plan to flex. Plants grow, needs change, and later phases rarely look exactly like the first sketch.
  • Ivy Street Design offers design-only or design-build, so you can phase the work with one team or bid it out.

What is a landscape master plan, and does a Denver yard need one?

A landscape master plan is a scaled drawing of your entire property that shows hardscape, structures, planting, drainage, and utilities before anything is built. Any yard that will be built in more than one stage needs one. Without it, each phase is a guess about the next.

Houzz describes a master plan as a detailed scaled drawing that covers site conditions such as sun, wind, soil, drainage, and slope, plus the hardscape, structures, and planting plan. One designer quoted there calls it a starting point and a blueprint for later decisions. Another says it usually keeps you from having to redo work.

For a Denver homeowner planning outdoor living, hardscape, water features, or a sloped yard rebuild, that is the real value. The plan is not a sales document. It is the reference every later phase is built against.

How do you phase a landscape project over several years?

Design the full property first, then divide construction into stages by disruption, budget, and daily use. Build what tears up the ground first, finish the areas closest to the house early, and save planting and finishing touches for later phases.

The Concrete Masonry and Hardscapes Association puts the sequence plainly: plan what the whole project could be at the very beginning, then build it in segments. Their guidance is to prioritize phases with your designer and contractor, and to define your vision before anything else: how you will use the space, how many people you entertain, and in which seasons.

At Ivy Street Design, that conversation starts with site analysis of your property's conditions. We then build the plan around how you actually live outside. A 3D presentation lets you see how the phases fit together before the first shovel goes in.

Five-step phase order: master plan, drainage and grading, walls and heavy work, infrastructure, patio near the house

What should be built first in a phased landscape?

Build the work that moves the most earth and touches everything else: drainage, grading, retaining walls, major structures, and the underground infrastructure that later phases depend on. Finished planting and decorative work come last.

The reasoning is consistent across the sources we reviewed. Here is how the early phases tend to break down:

  • Drainage and grading: This Old House quotes one expert saying drainage should be improved in the first stage, because fixing it later means tearing up landscaping you have already installed.
  • Heavy equipment work: Removing dead trees or planting large shade trees should happen in the earliest phase, so machines do not damage finished areas.
  • Retaining walls and foundations for structures: The CMHA article lists major excavation, retaining walls, and foundational structures among the elements to build first, because the largest items do the most damage.
  • Infrastructure for later phases: Empty conduits, gas lines, water and drainage lines, and irrigation are easiest to place while the ground is open. This Old House also says to leave room for future features such as an outdoor kitchen or a water feature.
  • Primary patio or deck: Start with the paved space closest to the home, and work outward. This Old House says starting there gets you the most use from your investment right away.

If your yard slopes, our retaining wall guide covers what to plan first with walls, and it belongs in phase one for the same reasons.

Why does building without a master plan cost more later?

Building piece by piece without a plan often means removing finished work to reach what sits behind it. A patio poured before the gas line is placed, or a lawn planted before the drainage is fixed, gets torn up when the next phase arrives.

The CMHA article makes the same point from the contractor side. One quoted expert says that if you build one phase without planning ahead, you might have to tear it up to build the next, for example when wiring or plumbing must reach other areas. The article also warns that paver shapes and colors change from year to year, so a later addition may not match. Its suggestion is to buy all materials upfront or plan for how to match them.

Quotes are harder to compare, too. A general request like "we want a patio" gets widely varying proposals. A drawn plan lets every contractor price the same scope.

Is it better to build everything at once or in phases?

Building everything at once is simpler and finishes sooner. Phasing spreads cost and lets you live with each stage. Both work, and the right choice depends on budget, schedule, and how disruptive the work is.

  • Build it all at once: One disruption instead of several, and one set of materials. One Houzz contributor recommends this when possible, noting that you will have it finished and that material costs are likely to rise.
  • Phase it over years: Costs are spread out and you learn how you use each space before committing to the next. The CMHA article quotes one expert saying later phases always get tweaked, and another saying phasing does not necessarily cost more money.
  • Phase with one team: Keeping the designer involved through each stage protects the original intent when budgets or priorities shift.

Houzz also notes you can phase for a simple reason: some elements, like trees and large ornamental shrubs, benefit from going in early so they mature while the rest of the project waits.

How does Ivy Street Design handle a multi-year master plan?

Ivy Street Design designs the full property, then helps you sequence construction. Because we offer design-only or design-build, you can hand the phased plan to us for construction or take the drawings to other contractors for bids.

Our design process includes site analysis, a 3D presentation, and construction observation. Construction observation matters on phased work, because someone who knows the plan checks what gets built against it.

If you are weighing who should build, read how design-build and design-only differ. For a sense of the schedule on the design side, see how long a landscape design project takes and what to expect from the design process.

What should you decide before a master plan meeting?

Decide how you want to use the yard, who uses it, and what must be finished first. Bring a property survey if you have one, any house plans, and a realistic budget range. Houzz recommends the same starting materials.

  • Use: Dining, entertaining, play, quiet seating, a water feature, a fire feature.
  • Priority: The one space you would regret not having by next summer.
  • Constraints: Slopes, drainage trouble spots, trees you want to keep, and access for equipment.
  • Timeline: Whether you want everything within one season or spread across several years.

Frequently Asked Questions

Can I build my landscape in phases and still get a cohesive result?

Yes, if the whole property is designed first. A master plan keeps materials, style, and layout consistent across every stage. Houzz quotes a designer who calls it a road map that keeps a common design theme throughout the property.

What gets built in phase one?

Usually drainage, grading, retaining walls, and utilities that later phases need, plus the main patio or deck near the house. These are the most disruptive and hardest to add after finished work is in place.

Does phasing cost more than building all at once?

Not necessarily. One expert quoted by CMHA says phasing does not necessarily cost more. Another source notes that material prices may rise while you wait, so the answer depends on your project and timeline.

Will the master plan change over the years?

Probably a little. Houzz advises not treating the plan as etched in stone, since plants grow and conditions change. The plan sets the direction, and you adjust details as you build.

Should the same company design and build every phase?

Not required. A drawn plan lets you bid each phase to different contractors. Ivy Street Design offers design-only or design-build, so you can choose what fits.

Call Ivy Street Design at (303) 320-0362 or visit ivystreetdesign.com to schedule a consultation.

More Blogs

See Our other Journal Entries.

Landscape Design in Washington Park Denver: Brick and Trees
Do You Need a Permit for Backyard Landscaping in Denver?
Water Feature Design in Denver: Options, Sound, Winter